Plant Monitoring → FFF reports is the QC manager's random audit. A report picks windows at random that are physically at a stage right now — frame, sash, glass, screen, or an assembled window — on orders still in production that have not shipped or been picked up. A window checked in the last three days is not picked again. If a part has nothing to pick, the report says so.
A report is drawn by itself at the times set under Setup (on days the plant works), or by pressing "Draw a report now". Its sheet prints at the QC printer when one is set up (Plant Monitoring → Machines); otherwise press "Open the sheet (PDF)" and print it. Production is told on the bell when a report is ready.
Each window has a few checklist lines with an OK box and a FAIL box. The lines come from the checklist under Setup and change from report to report, so the same things are not asked every time.
To record the results, press "Scan the filled sheet in" — the ticks are filled in from the scan as a suggestion — or tick the boxes yourself. Check them against the paper, then press "Confirm the report". Nothing counts until you confirm. Every line on a window must be marked, or none with a note saying why it could not be checked; a half-marked window holds the report.
A failed check shows "Raise a remake": pick the defect code and the remake goes back to the bench that builds that part. A report nobody confirmed by the end of its day reads as missed. Void takes a report out, with a reason.
This is the same help that ships inside Extrusia, where Josie, the built-in assistant, answers questions from these articles. All help articles.