A PO starts as a DRAFT addressed to one supplier — pick the vendor first, because costs and part lists follow from who it is. Add lines (the "what's short from this vendor" button pre-fills from the material plan), then APPROVE & SUBMIT: that fixes the lines and sends the order down whatever wire this supplier uses — email with the PDF attached, their ordering system, or a logged hand-off for a vendor you phone. Anything that would stop it reaching them (no address, no endpoint, missing vendor part numbers) is refused before the order is issued, so a PO never says "issued" with nobody at the other end having heard of it. "Issue without sending" is there for an order somebody else is placing. After issue the dock receives against it. A draft can be cancelled freely; an issued PO with nothing received can be cancelled too. Once something HAS arrived, the way out is CLOSE SHORT: the receipts stay on the books as history, and the undelivered balance stops counting as incoming supply everywhere — the material plan, backorder coverage, and the chase list all drop it at once. Use it when the vendor short-shipped and will not send the rest.
Quantities are in the vendor's own unit — extrusion vendors sell BARS, not feet. Search POs by number, vendor, or reference from the list or ⌘K.
This is the same help that ships inside Extrusia, where Josie, the built-in assistant, answers questions from these articles. All help articles.