The office work around a document — site measure confirmed, special glass ordered, install scheduled — lives as a checklist on the quote or order itself. Tick an item and it records who and when; the pencil adds a note ("measured 8/27, all openings square"). Checklists NEVER hold up the plant: an order with open items still confirms, batches, and ships — the list makes the work visible, it does not gate it.
They are not silent, though. Once an order reaches the floor, any office step still open on it is counted on "What needs attention" and said in the morning brief — a job being built with the glass not yet ordered is worth hearing about, and that is the one place a checklist speaks up.
Lists attach automatically from templates (press ⌘K and type "checklist" to author them) or by hand from the panel's Attach menu. Removing a list removes its ticked history with it.
This is the same help that ships inside Extrusia, where Josie, the built-in assistant, answers questions from these articles. All help articles.