An order moves: SUBMITTED → CUT BATCHING → IN PRODUCTION → COMPLETE, with CANCELLED possible until completion. Submitted means sold, not yet handed to the plant. Cut batching means confirmed and sitting in the batching pool — it advances when a production batch containing it is RELEASED (releasing the batch releases its orders). In production means the floor has it; the scans at each station move the work orders, and the order completes when its work is done or when marked complete.
If an order looks stuck, the flow panel on the order says exactly what it is waiting for: an unpaid deposit blocks confirmation; an unbatched order waits to be added to a batch; an unreleased batch waits for Release. Cancelling and completing are the only manual status moves — everything else happens through batching and the floor.
Cancelled is final — a killed order never restarts — but the job is not lost: RE-ENTER AS NEW QUOTE on the cancelled order (or Duplicate on any quote) copies every line into a fresh draft, priced at today's book, and names any line the current catalog no longer accepts instead of carrying it in.
This is the same help that ships inside Extrusia, where Josie, the built-in assistant, answers questions from these articles. All help articles.